2007
May -
Full engine service
Renew and regrease stuffing
box
Antifoul
June -
Sailing!!!!!
July -
Clean and oil topside teakwork
Replace MOB lights
Replace fender lines
New
domestic batteries
Make up permenant docklines
2008
Feb -
Full Corgi
inspection of gas system. Regulator and changeover switch replaced, bubble leak detector fitted. Braided hose to cooker
replaced.
Double coat of polish to hull.
Seacocks serviced.
Handheld
radio charger fitted.
March -
New cutlass bearing fitted.
Replace engine mounts.
Engine bay fire extinguisher
fitted.
Antifoul with International Uno.
Replace some of the running rigging.
April -
Replace sprayhood and sail cover.
Curtains replaced.
Engine
serviced.
May -
Serviced toilet.
Fixed
leaking waste pump out deck fitting.
June -
Replaced VHF radio, installed remote mic to cockpit.
Fitted EPIRB.
Replaced more running rigging.
July -
Replaced
horse shoes.
Replaced Wheel, hatch and sprayhood covers.
2009
Jan -
Replace stern gland with PPS dripless seal.
Relace again, thanks to the incompetence of a certain Gosport based engineering company the cutlass bearing.
Replace prop with Darglow Featherstream 3 bladed prop.
Feb -
Replace taps and shower in heads
March -
New main and genoa
Engine service
June
-
Purchase genoa cover
Replace more running rigging
August -
Clean and oil decks
New engine thermostat
New engine instrument cluster